SOLAR POWER PLANT

SOLAR POWER PLANT

TÜRKMEN – 1 SPP, KUŞADASI

For the investment of SUOZ Energy Group, Turkmen-1 SPP which is located in Aydın and has 10 MW installed capacity, 30.000 solar PV modules manufactured in Mar Solar PV Module Production Factory are used.
A uniaxial tracking system is used for 5,5 MW of the plant and the rest is installed on a fixed system.
Production of the facility meets the electricity demand of 7,800 households.